BehindLines

Bristol: a new station reopens the Henbury line

· BehindLines newsroom

A new station opens to passengers on Monday 23 November in north Bristol, in the United Kingdom. Bristol Brabazon brings passenger trains back to the Henbury line, a first since 1964, according to New Civil Engineer. The magazine Railnews says the station was formally declared open on 19 November, several days before the first public train.

A station designed for a neighbourhood under construction

According to New Civil Engineer, the British rail regulator, the Office of Rail and Road, has authorised the first phase of operation, after checks covering safety, accessibility, environmental protection and reliability, among other things. The station has two platforms linked by an accessible footbridge. Great Western Railway will initially run one train an hour there. The first public departure is scheduled for 23 November at 7:10 a.m. to Bristol Temple Meads, Railnews reports.

The station is meant to serve the developing Brabazon neighbourhood and offer connections to Temple Meads and the rest of the network. A second building phase adds a further ramped footbridge, a ticket office with staff, public toilets and a plaza. Both outlets also mention service to the Aviva Arena, a 20,000-capacity venue that, according to Railnews, will open in 2028.

Funding and what comes next

Railnews writes that the station was paid for by the regional authority West of England Mayoral Combined Authority, covering Bristol, the south of Gloucestershire, and Bath and North East Somerset. According to the magazine, it is one of five stations scheduled across the region during the coming two years, within a £600 million investment programme. The same source says the Portishead line is due to link directly to the Henbury line starting in winter 2028-2029.

A direct link with Wales

New Civil Engineer also reports that Transport for Wales plans, from 13 December, direct trains between West Wales and Bristol, with no change at Cardiff Central. Services will start from Milford Haven and Fishguard, roughly every two hours from Monday to Saturday. The timetable provides for nine services to or from Bristol on weekdays and Saturdays, eight of them for West Wales and one from Cardiff, then five services on Sunday.

Why it matters

For the first time since 1964, passengers are back on the Henbury line, and the new Brabazon neighbourhood has a station. According to New Civil Engineer, the direct link with West Wales is meant to give people more ways to travel for jobs, study and leisure, and belongs to a push to get more people onto public transport on the M4 corridor.

Sources